Sewage Sludge Treatment Thickening&Dewatering Plant with Capacity 600tpd

Product Details
Customization: Available
Type: Sludge Dewatering Machine
Method: Combined Treatment
Manufacturer/Factory & Trading Company
Gold Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
603269.38 USD
Plant Area
18819.25 square meters
  • Sewage Sludge Treatment Thickening&Dewatering Plant with Capacity 600tpd
  • Sewage Sludge Treatment Thickening&Dewatering Plant with Capacity 600tpd
Find Similar Products

Basic Info.

Model NO.
BJTS-600
Usage
Industrial
Product Name
Sewage Sludge Treatment Thickening&Dewatering Plan
Material
Steel
Land Needed
300m²
Labor Needed
3
Electricity
30kw/H
Water Content
99%-0
Air Emission
CO2, H2O
Transport Package
Full Container
Specification
600tpd
Trademark
Benji
Origin
China
HS Code
8421219990
Production Capacity
200sets/Year

Product Description

Sewage Sludge Treatment Thickening&Dewatering Plant with Capacity 600TPD
The goal of this plant is to realize sludge reduction
stabilization,harmless and recycling.

1,Reduction
We can customized produce plant according to your refinements.Mostly moisture content of sludge more than 90%,we can reduce it to 0% if you need.

2,Stabilization
Stabilization means that the sludge can remain basically stable after harmless treatment, especially without corruption and stench.

3Harmless
Sludge contains a large number of pathogenic bacteria, parasitic worm eggs and viruses, which are easy to cause the spread of diseases.So it must need a harmless treatment in process.

4Recycling.
It is important but hard to do. Our company can realize this.The economic benefits will be generated in the sludge treatment, so that the sludge treatment government can not only obtain additional benefits, but also improve the operators' enthusiasm and promote the sustainable development of sludge treatment.

Sewage Sludge Treatment Thickening&Dewatering Plant with Capacity 600tpd
Sewage Sludge Treatment Thickening&Dewatering Plant with Capacity 600tpd

(1) Process Line 

Sludge drying to 50-60% moisture content-Incineration with combustion improver-Vapour and Dust Purification-Discharge;The deslagging has no moisture and organics,heavy metals in standards,inorganic matter can be recycled or to backfill 

(2)Drying Process
The equipment has installed auto intelligent  temperature control system,after first drying,moisture content will reduce to 50-60%. But actually in real production,you can control the moisture content freely,for example 10-40% or 0. 

(3)Incineration Process
After drying, the sludge and garbage goes into the incinerator, burned above 700 ºC temperature and  pyrolysis for combustible gas and carbon dioxide gases such as carbon monoxide;The burnt slag is yellowish brown.
(4)Smog and Dust Purification Process:
Heat Exchange.
Denitration.
Desulfurization.
Ionize "Purification".
Purification Gas Photolysis.
This technology is advanced internationally.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier